Project Name – Environmental Closure Drilling

Overview –

  • Drill and Sample upstream and downstream wall, intersect foundation on both the Main and Saddle dam tailings storage

Drilling was separated into two primary sections:

  • Section One – Sonic drill 100mm x 150mm sampled and cased drill holes and install 50mm standpipe piezometers nested with vibrating wire piezometers
  • Section Two – Sonic drill 100mm x 150mm sampled and cased drill holes and install nested vibrating

wire piezometers

  • All upstream drilling was conducted utilising the DRY sampling and casing method
  • All downstream drilling was conducted utilising the dry sampling and wet casing method
  • Drilling was part of the environmental closure assessment on behalf of one mine partner
  • Drilling depths ranged from 15m to 95m

Project Name – Olympic Dam

Overview –

  • Drill and Sample tailings dam wall, intersect foundation to ascertain any environmental impact due to radioactive waste, Insitu testing for structural defects
  • Sonic drill 100mm x 150mm sampled and cased drill holes and install 50mm standpipe piezometers for ongoing monitoring
  • All upstream drilling was conducted utilising the DRY sampling and casing method
  • Drilling was part of the environmental and structural assessment
  • Drilling depths ranged from 30m to 50m

Project Name – Lihir PH15 Expansion

Overview –

  • Drill and Sample pit wall, intersect foundation to ascertain slip prone zones, Insitu testing for structural defects
  • Sonic drill 100mm x 150mm sampled and cased drill holes and install nested vibrating wire piezometers
  • Sonic drill 100mm x 150mm sampled and cased drill holes and install inclinometers
  • All drilling was conducted utilising the DRY sampling and wet casing method
  • Drilling was part of the structural assessment for pit expansion
  • Drilling depths ranged from 20m to 150m